A two-bay open-fronted oak frame garage with featheredge-clad sides and a slate roof, on a gravel drive.
Garages and outbuildings

Oak frame garages, car ports and outbuildings

Garages and outbuildings

Quick facts

Cost per m², including VAT, before design and approvals

  • Designed and built: £1,090 to £1,750
  • Supplied and installed: £570 to £1,030
  • Supply only: £330 to £530

Sizes

  • One bay: 3.0 m × 6.0 m, 18 m²
  • Two bays: 6.0 m × 6.0 m, 36 m²
  • Three bays: 9.0 m × 6.0 m, 54 m²
  • Four bays: 12.0 m × 6.0 m, 72 m²

Timing

  • Designed and built: 12 to 14 weeks lead time, then 3 to 7 weeks on site depending on size
  • Supplied and installed: 8 weeks lead time
  • Supply only: 6 weeks lead time

Two to four bays, open-fronted, under slate. From our price calculator, rates at 9 October 2026.

Price your garageStart an enquiry

Why build your garage in oak?

Because the frame is the building. The oak is on show inside and out, the pegged joints pull tighter as it dries, and the garage sits with the house instead of in front of it.

Foxtail Oak designs and builds oak framed garages, car ports and cart lodges within 90 minutes of our workshop near Abergavenny, and supplies frames cut and numbered anywhere in the UK. A two-bay garage like the one pictured, open-fronted under slate, comes to about £55,000 to £67,000 including VAT, designed and built.

How much does an oak frame garage cost?

About £55,000 to £67,000 for two bays and £69,000 to £84,000 for three, designed and built, including VAT. As a kit to put up yourself, two bays are about £15,500 to £19,000.

Designed and built, including VAT

  • One bay, 3.0 m × 6.0 m: £38,000 to £47,000
  • Two bays, 6.0 m × 6.0 m: £55,000 to £67,000
  • Three bays, 9.0 m × 6.0 m: £69,000 to £84,000
  • Four bays, 12.0 m × 6.0 m: £86,000 to £105,000

That is roughly £1,590 per m² of external footprint, before design and approvals, for two bays and £1,340 for three, because the fixed costs spread further. The figures are for open bays under a slate roof, with British cedar featheredge on the closed sides. What each option adds is under What size oak garage do you need?

Garage prices advertised online are usually for a frame kit you put up yourself. Our designed-and-built price also covers the planning drawings, the base, the roof covering, the walls and managing every trade, which is why the two figures are so far apart.

Every figure includes VAT at 20%, because that is what you will pay at an existing house. A garage built at the same time as a new house, to be used with it, is normally zero-rated.

From our price calculator, rates at 9 October 2026. Every size at every way of buying: How much does an oak frame garage cost?

Do you need planning permission for an oak garage?

Often not. Many garages fall under permitted development, though listed buildings, conservation areas, the National Park and a room above all change that.

We will tell you plainly what applies to yours at the design visit. Even where a garage is permitted development, we advise getting a Lawful Development Certificate, so the question is settled when you sell. On a design-and-build job the planning application and the building regulations drawings are in the price; the council's own fees are not.

Can you buy an oak garage as a kit?

Yes. Supply only is our kit: about £15,500 to £19,000 for two bays, cut, numbered and delivered anywhere in the UK.

There are three ways to buy, and the frame is the same in each.

Supply only

About £15,500 to £19,000 for two bays. The oak frame, the roof structure, the studwork and the boards, cut, numbered and delivered for you or your builder to raise. Our consulting engineer checks the frame, and it comes with a setting-out drawing for the base. A bigger frame comes off the lorry by crane, quoted as an extra.

Supplied and installed

About £29,000 to £35,000 for two bays. We make the frame and put it up, with the wall panels, the boarding and the roof structure ready for your roofer. Your builder does the base, the roof covering and gutters, the doors and the drainage.

Designed and built

About £55,000 to £67,000 for two bays. We do all of it: the design, the planning application and building regulations drawings, the engineer, the base, the frame, the walls and boarding, the roof covering and gutters, and managing every trade on the job.

Who does what?

| Designed and built | Supplied and installed | Supply only

Design, drawings and engineer | us | us | us

Planning application | us | extra | you (we'll advise)

Base, on ordinary ground | us | your builder | your builder

Deeper or piled foundations | your builder | your builder | your builder

Oak frame | us | us | us

Raising the frame | us | us | your builder

Wall panels and boarding | us | us | supplied, cut and numbered

Roof structure | us | us | supplied, cut

Roof covering, gutters and downpipes | us | your builder | your builder

Garage doors | priced per job | your builder | your builder

Managing every trade on the job | us | you | you

Planning and building control fees | you | you | you

More detail: Supply only, supply and install, or design and build: which is right for you?

What size oak garage do you need?

One to four bays, each 3.0 m wide and 6.0 m deep as standard, or 7.0 m deep. The one we build most is three bays, two open and one closed.

  • One bay: 3.0 m × 6.0 m, 18 m²
  • Two bays: 6.0 m × 6.0 m, 36 m²
  • Three bays: 9.0 m × 6.0 m, 54 m²
  • Four bays: 12.0 m × 6.0 m, 72 m²

Measured to the outside of the frame. A hipped roof only works where the garage is at least as wide as it is deep, so a single bay has a gable. Other sizes are drawn to suit. Decide early which bays will ever have doors, because a bay that takes doors needs a heavier post and beam over the opening.

Each bay is 3.0 m wide, measured to the outside of the frame, with 2.1 m of headroom.

What do the options cost?

  • Boarded fronts instead of open: adds about £4,500
  • 7.0 m deep instead of 6.0 m: adds about £5,500
  • Oak boarding instead of cedar: adds about £1,500
  • Tiled roof instead of slate: saves about £3,500
  • Hipped roof instead of gable: saves about £1,000
  • Garage doors: priced per job
  • A room above: priced per job
  • Deeper foundations, where the ground needs them: priced per job

On two bays, designed and built, including VAT. From our price calculator, rates at 9 October 2026.

Can you have a room above an oak garage?

Yes, but it turns a garage into something closer to a small house, and it is priced per job.

A room above brings a planning application, full building regulations, a structural first floor, a stair and a fire-resisting floor. The posts go up to 200 mm so the walls can be insulated. We price it on the footprint counted once, not on both floors added together. As a guide, the room above adds about £1,200 per m² of room including VAT (£1,000 plus VAT).

  • A guest annexe At Crickhowell, a workshop below and a guest annexe above, under exposed oak trusses.
  • A storage floor At Caerleon, a floor over the home gym bay, for storage rather than living in.

Can you have an oak car port or cart lodge instead?

Yes. A car port or cart lodge is a garage with open bays, and the prices above are for exactly that.

Open bays are the cheapest version per square metre. Boarding the fronts adds about £4,500 on two bays. An open cart lodge can stand on 150 mm posts, but if you might add doors later, say so at the design stage: a bay that takes doors needs a heavier post and beam.

What other outbuildings can you build?

The same frame takes a workshop, a home gym or a storage floor as well as cars.

At Portskewett one bay is a home gym. At Caerleon the gym bay has a storage floor over it. At Crickhowell the ground floor is a workshop, with a guest annexe above.

For a workshop or a gym we insulate with PIR boards fitted between the studs.

What do you get for the price?

A garage or cart lodge is the most exposed thing we build. There is nowhere for a bad joint to hide: the frame is the building, inside and out.

The oak frame of a two-bay garage raised on its slab, with the roof structure on and the wall studwork in place
The frame up, with the roof structure and wall studwork in place
The same two-bay oak frame garage finished: open-fronted, featheredge boarded sides and a slate roof
The same garage, boarded and under slate

What is the oak like?

  • Oak: green oak as standard, QPA visual grade, D30 strength class
  • Sapwood: none in green oak. Air-dried oak can't be guaranteed sap-free, because it comes to us already cut
  • Finish: planed and chamfered
  • Joints: every mortice and tenon draw-pegged
  • Cutting: complex joints by our carpenters near Abergavenny, routine cuts machined at our sawmill from our own files
  • Engineering: signed off by our consulting engineer, whichever way you buy
  • Weathering: left to silver-grey unless you ask otherwise

What should you check on any oak garage quote?

Quotes differ mostly because they aren't pricing the same building. Ask every firm, in writing:

  • What is included
  • The grade and strength class of the oak
  • Whether it has sap in it
  • Whether it is planed or sawn
  • Whether the joints are pegged
  • Whether the price includes VAT

More detail: Why do oak frame garage quotations differ so much?

Which oak garages have we built?

A few of the garages we have designed and built. Each one has its own page, with the photographs and the story of the job.

The two-bay oak frame garage at Portskewett, cedar featheredge boarding and a slate roof
Portskewett

Oak frame garage at Portskewett: Portskewett, Monmouthshire, 2026. Two bays, 37.8 m², designed and built. A car bay and a home gym under a natural slate roof to match the house.

The three-bay oak frame garage at Caerleon under a slate roof
Caerleon

Oak frame garage at Caerleon: Caerleon, Newport, 2023. Three bays, 48 m², supplied and installed. Two car bays and a home gym bay, with a storage floor over the gym.

The annexe above the oak frame garage at Crickhowell, under exposed oak trusses
Crickhowell

Oak frame garage and annexe at Crickhowell: Crickhowell, Powys, 2026. 125 m² over two floors, designed and built inside the National Park. A workshop below and a guest annexe above.

More of our work: see every project.

How long does an oak garage take to build?

On site, designed and built, one bay typically takes 3 to 4 weeks, two bays 4 to 5, three bays 5 to 6 and four bays 6 to 7. That is time at your home. Before it comes the wait for a place in our diary, counted from your deposit: 6 weeks for supply only, 8 weeks for supply and install, and 12 to 14 weeks for design and build. Planning, where a garage needs it, is separate.

A two-bay garage on site

About 19 working days of work, over four to five weeks:

  1. Groundwork and the slab: 3 working days
  2. The oak frame raised, and the roof structure: 5 working days
  3. A gap of about a week while the roofer is booked
  4. The roof covering: 6 working days
  5. Boarding, and doors where there are any: 5 working days

The frame takes about four days in our workshop beforehand. If we supply and install the frame for your builder, we are on site for about five working days. From our design tool, rates at 9 October 2026.

From first call to finished garage

  1. A phone or video call, then a design visit, or drawings and photographs if you are further afield
  2. The bay layout and roof form agreed. This is where most of the cost sits
  3. Frame design, and sign-off by our consulting engineer
  4. The frame cut and made at our sawmill and workshop
  5. Groundworks and the slab: ours on a design-and-build job, otherwise your builder's
  6. Raising and roofing, then the boarding and doors

How long will an oak garage last?

For generations, if it is detailed to shed water. Exposed oak that is well detailed lasts about 50 years or more, and oak inside a weather envelope lasts centuries.

What should you expect from green oak?

It cracks along the grain and twists a little as it dries, which the pegged joints are designed for. It bleeds tannin onto paving below it in its first year or so, and it weathers to silver-grey unless you keep oiling it.

What upkeep does it need?

Very little, if you leave the oak to silver, which is what we would choose. If you oil it, it needs oiling again every year. The roof, the boarding and the gutters need looking after like any building's.

Does an oak garage add value to your house?

Nobody can give you a percentage, and we won't. A garage helps a sale when it is consented, the right size for the house, well built and usable.

A room above adds floor area, which is what a valuation is built on. Does a garage add value to a house? goes through what helps a sale and what hurts one.

Is an oak garage right for you?

It suits you if

  • The building will be seen from the house or the road
  • You want it to sit with what is already there
  • You want the frame on show, with every joint visible inside and out

Something else may suit you better if

  • You need covered storage nobody will look at. A softwood or steel building is usually cheaper
  • You want oak but need to keep the cost down. Open bays cost less than an enclosed garage

What else do people ask?

Do you build oak frame garages in my area?

We design and build within 90 minutes of Abergavenny. We supply and install within two and a half hours of Abergavenny, and elsewhere in the UK case by case. We supply frames cut and numbered to anywhere in the UK.

Can I lay the base myself?

Yes. On a design-and-build job you can build the base to our drawing, level and square to within 5 mm. We check it before the frame goes up, and the price drops to match. If you buy supply only or supply and install, your builder lays the base to our setting-out drawing.

Can you build on my existing base?

Sometimes. It depends on the slab, and we check it on the design visit before we quote.

What should you read next?

Scribe

by Foxtail Oak

How much would yours cost?

Shape it, turn it round in 3D and see what it costs, three ways to buy. It takes about a minute.

Start →
Price your garageEnquire
A two-bay open-fronted oak frame garage with featheredge-clad sides and a slate roof, on a gravel drive.
WHAT WE BUILD

Oak frame garages, car ports and outbuildings

An oak frame garage, car port or outbuilding is a building where the oak frame is the structure you see, inside and out: usually two or three bays, open-fronted or boarded, sometimes with a room over. Foxtail Oak designs and builds them within 90 minutes of our workshop near Abergavenny and supplies frames anywhere in the UK. A two-bay garage like the one pictured, open-fronted under slate, comes to about £55,000 to £67,000 including VAT, designed and built.

Price
Two bays, designed and built: about £55,000 to £67,000 · three bays: about £69,000 to £84,000 · including VAT, from our price calculator, rates at 9 October 2026
Typical footprint
Two bays 6.0 m × 6.0 m · three bays 9.0 m × 6.0 m
Lead time from order
Supply only 6 weeks · Supply and install 8 weeks · Design and build 12–14 weeks, from your deposit
Time on site
Designed and built: one bay 3–4 weeks, two bays 4–5, three bays 5–6, four bays 6–7
Start an enquiry

What does it cost?

A two-bay oak frame garage, designed and built, costs about £55,000 to £67,000 including VAT, and three bays about £69,000 to £84,000. That is roughly £1,590 per m² of external footprint for two bays and £1,340 for three, because the fixed costs spread further. Those rates leave out design and approvals, which are one figure for the job: about £2,000 including VAT for one bay, £3,900 for two or three, and £3,100 for four plus building control, which we quote once the size is fixed. The council's own planning fee, £283 in Wales, is paid direct. The prices above include design and approvals. External footprint is the overall width times the overall depth, measured to the outside of the frame.

Those figures are for open bays under slate, with British cedar featheredge on the closed sides. Boarding the front of the bays adds about £4,500 on a two-bay, a tiled roof saves about £3,500, and oak boarding instead of cedar adds about £1,500. Garage doors and a room over are priced per job.

These prices include VAT at 20%, because that is what you will pay. Some firms quote without it, so check before you compare. A garage built at the same time as a new house, to be used with it, is normally zero-rated. Tell us if that is your case and we will price it that way.

For your own number of bays, depth, roof and boarding, our price calculator gives the range in a minute. Every size worked through is in How much does an oak frame garage cost?

What are you getting for the price?

Green oak as standard, to QPA visual grade and D30 strength class, sap-free, planed and chamfered, with every mortice and tenon draw-pegged. Where a project uses air-dried oak instead, we can't guarantee it's sap-free, because it comes to us already cut.

  • Engineering: always signed off by our consulting engineer, whichever way you buy.
  • Joints: the complex joints cut by our carpenters at our workshop near Abergavenny, the routine cuts machined at our sawmill from our own files.
  • Weathering: left to silver-grey unless you ask otherwise.

What should you check on any oak garage quote?

Quotes differ mostly because they aren't pricing the same building. Ask every firm, in writing:

  • What's included
  • The grade and strength class of the oak
  • Whether it has sap in it
  • Whether it's planed or sawn
  • Whether the joints are pegged
  • Whether the price includes VAT

More in Why do oak frame garage quotations differ?

Is it the right choice for you?

When is an oak frame the right choice?
When the building will be seen from the house or the road and you want it to sit with what is already there. The frame is the building, so every joint is on show.

When might something else suit you better?
If you need covered storage that nobody will look at, a softwood-framed or steel building is usually the cheaper way to get it. If you want oak but need to keep the cost down, open bays cost less than an enclosed garage.

Which version do you need?

Open bays
A car port or cart shed, open at the front. The simplest version and the cheapest per square metre, and it ages well.

An enclosed garage
The same frame closed in with walls and doors, for anything that needs to stay dry and out of sight.

A room over
A floor, a staircase, insulation and a usable space above the bays: a guest annexe, as at Crickhowell, or a storage floor, as at Caerleon. A habitable room over is closer to a small house than a shelter, so it is priced per job.

How much of it do you want us to do?
We can design and build it, make and raise the frame for your own builder to finish, or supply the frame cut and numbered for someone else to raise.

What does the price cover?

Who does what?

Swipe to see Supply and install and Supply only →

| Design and build | Supply and install | Supply only

Detailed design and drawings | us | us | us

Planning application | us | extra | you (we'll advise)

Engineering (always, by our consulting engineer) | us | us | us

Base, on ordinary ground | us | you or your builder | you or your builder

Deeper or piled foundations, where the ground needs them | you or your builder | you or your builder | you or your builder

Oak frame | us | us | us

Raising the frame | us | us | you or your builder

Roof structure | us | us | us (cut and delivered)

Wall studwork, membrane and counter-battens | us | us | us (studwork cut and numbered)

Cladding boards, and fascia and barge boards | us | us | us (loose, over length)

Roof covering, gutters and downpipes | us | you or your builder | you or your builder

Garage doors | priced per job | you or your builder | you or your builder

Electrics and lighting | extra, or you or your electrician | you or your builder | you or your builder

Drainage | drawing by us; the work is extra, or you or your builder | you or your builder | you or your builder

Bringing power, water or drainage from the house | you or your builder | you or your builder | you or your builder

Diverting existing services where the garage will go | you or your builder | you or your builder | you or your builder

Room over | priced per job | you or your builder | you or your builder

Managing every trade on the job | us | you | you

Landscaping | extra | no | no

Planning and building control fees | you | you | you

What have we built?

How long will it take?

About 19 working days on site, spread over four to five weeks, for a two-bay garage designed and built. The frame takes about four days in our workshop beforehand. One bay takes 3 to 4 weeks on site, three bays 5 to 6 and four bays 6 to 7.

  1. Groundwork and the slab: 3 working days
  2. The oak frame raised, and the roof structure: 5 working days
  3. A gap while the roofer is booked
  4. The roof covering: 6 working days
  5. Boarding and doors: 5 working days

If we supply and install the frame for your builder, we are on site for about five working days. From our design tool, rates at 9 October 2026.

1. A design visit, or drawings and photographs if you are further afield.

2. Bay layout and roof form agreed. This is where most of the cost sits.

3. Frame design, and engineering sign-off by our consulting engineer.

4. Machining and cutting: the routine cuts machined at our sawmill from our own files, the complex joints cut by our carpenters at our workshop near Abergavenny.

5. Groundworks and slab: ours on a design-and-build job, otherwise your builder's.

6. Raising and roofing, then the boarding and doors.

Lead time from your deposit: supply only 6 weeks, supply and install 8 weeks, design and build 12 to 14 weeks. On a design-and-build job the frame goes on the bench once planning is granted, or from signing if none is needed.

How do we approach it?

A garage or cart shed is the most honest thing we build. There is nowhere for a bad joint to hide: the frame is the building, inside and out.

Most are two or three bays, open-fronted or with doors, and we detail them to suit what stands next to them. A cart shed beside a stone farmhouse near Usk gets different proportions from an enclosed garage on a new plot. Oak is left to weather to silver-grey unless you ask otherwise.

What else do people ask?

Do I need planning permission?
Often not. Many outbuildings fall under permitted development, though listed buildings, conservation areas and the National Park change that. We will say plainly what applies.

Do you build oak frame garages in my area?
We design and build within 90 minutes of Abergavenny. We supply and install within two and a half hours of Abergavenny, and elsewhere in the UK case by case. We supply frames cut and numbered to anywhere in the UK. There is a wait of several weeks before anything starts.

Can you do the groundworks?
On a design-and-build job, yes: the slab, groundworks and any plinth walls are ours. If we're making and raising the frame for your own builder, or supplying it only, your builder lays the base to our setting-out.

Open bays or doors?
Both. Open bays are cheaper and age better. Doors are worth it if you are storing something that needs to stay dry and out of sight.

Do you supply as a kit?
Yes. Supply-only frames go anywhere, cut and numbered ready to raise, with assembly drawings.

Does a garage add value to a house?
It can, if it is consented, well built and the right size for the house. Our guide Does a garage add value to a house? goes through what helps a sale and what hurts one.

WHAT HAPPENS NEXT

How do I start?

Tell us what you have in mind and where it's going. The first step is a phone or video call with Josh, using your photos. If it looks right for both of us, we come to you for a design visit, and a detailed quotation follows.

Start an enquiry

PRICES

What will yours cost?

Choose the size and finish in our price calculator and see the range at each way of buying, including VAT.

Use the price calculator